Fuel spend$17,0692023 · estimate
Capacity in service41.9MW1 unit · gas
Net generation194MWh2023 · reported
CO₂ emitted400t2023 · reported to EPA · 5,994th highest of 6,030 in the US
Rank in Mississippi#41of 59 · by capacity · #3,721 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor0%2023
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Sweatt Electric Generating Plant?
41.9 MW across 1 generating unit in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by
The Southern Co (100%) and operated by Mississippi Power Co, filed as investor-owned utility.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1971.
When is it due to retire?
No retirement date has been filed for any operating unit at Sweatt Electric Generating Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $17,069 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
400 t in 2023, reported to the EPA — the 5,994th highest of 6,030 US facilities that reported. Down from 6,468 t in 2011.