Fuel spend$1.31M2023 · estimate
Capacity in service28.4MW2 units · gas
Net generation58GWh2023 · reported
CO₂ emitted24,809t2023 · reported to EPA · 5,156th highest of 6,030 in the US
Rank in Mississippi#43of 59 · by capacity · #4,102 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor23%2023
How big is Benndale Peaking Station?
28.4 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. Every operating unit came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Benndale Peaking Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.31M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
24,809 t in 2023, reported to the EPA — the 5,156th highest of 6,030 US facilities that reported. Down from 29,378 t in 2022.