AMERICAN ENERGY ATLAS
Power·Michigan

Sumpter Plant

Belleville, Wayne County, Michigan · MISO · operated by Wolverine Power Supply Coop · owned by Wolverine Power Supply Cooperative Inc

2023 · headline year
Reported fuel cost$5.71M2023 · reported deliveries
Capacity in service340MW4 units · gas
Net generation112GWh2023 · reported
CO₂ emitted78,183t2023 · reported to EPA · 2,823rd highest of 6,030 in the US
Rank in Michigan#20of 258 · by capacity · #911 (tied) of 13,147 US
Reported suppliers42023 · 36 deliveries
Capacity factor4%2023

Location

Wayne County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.46 TBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 340 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 185.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 285.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 385.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 485.0Natural GasNatural Gas Fired Combustion Turbine2002Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

1 of 4 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
BP North AmericaNatural gas1.05n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 290 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 4 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wolverine Power Supply Coop
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000222
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
7972

Common questions

How big is Sumpter Plant?
340 MW across 4 generating units in service.
Who owns and operates it?
Owned by Wolverine Power Supply Cooperative Inc (100%) and operated by Wolverine Power Supply Coop, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. Every operating unit came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at Sumpter Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 4 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $5.71M in 2023.
How much CO₂ does it emit?
78,183 t in 2023, reported to the EPA — the 2,823rd highest of 6,030 US facilities that reported. Up from 32,179 t in 2011.

Related pages

Michigan energyAll facilities in the state→Isabella Wind Park384 MW operating capacity→ DTE East China358 MW operating capacity→ Erickson263 MW operating capacity→ Cross Winds Energy Park231 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming