Lansing, Eaton County, Michigan · MISO · operated by Lansing Board of Water and Light · owned by Lansing Board of Water & Light
2023 · headline year
Reported fuel cost$22M2023 · reported deliveries
Capacity in service263MW4 units · gas
Net generation932GWh2023 · reported
CO₂ emitted396,358t2023 · reported to EPA · 1,070th highest of 6,030 in the US
Rank in Michigan#21of 258 · by capacity · #1,132 of 13,147 US
Reported suppliers52023 · 31 deliveries
Capacity factor40%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 7.39 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 263 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit DEPST
89.2
Natural Gas
Natural Gas Fired Combined Cycle
2022
Operating
Unit DEPC2
58.0
Natural Gas
Natural Gas Fired Combined Cycle
2022
Operating
Unit DEPC3
58.0
Natural Gas
Natural Gas Fired Combined Cycle
2022
Operating
Unit DEPS1
58.0
Natural Gas
Natural Gas Fired Combustion Turbine
2022
Operating
Unit 1
154.7
Subbituminous
Conventional Steam Coal
1973
Retired 2022
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 5 suppliers. Subscribe to see all 5, every one of the 336 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
263 MW across 4 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 1832 and 63259, filed under one facility.
Who owns and operates it?
Owned by Lansing Board of Water & Light (100%) and operated by Lansing Board of Water and Light, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. Every operating unit came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Erickson. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 5 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $22M in 2023.
How much CO₂ does it emit?
396,358 t in 2023, reported to the EPA — the 1,070th highest of 6,030 US facilities that reported. Down from 1.01 Mt in 2011.