CO₂ emitted1.18Mt2023 · reported to EPA · 519th highest of 6,030 in the US
Rank in Indiana#16of 202 · by capacity · #558 of 13,147 US
Reported suppliers12023 · 10 deliveries
Capacity factor54%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 21 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 619 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST1
213.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CT01
203.2
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit CT02
203.2
Natural Gas
Natural Gas Fired Combined Cycle
2002
Operating
Unit ST2
195.4
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
Unit CT21
159.0
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
Unit CT22
154.3
Natural Gas
Natural Gas Fired Combined Cycle
not reported
Canceled
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 150 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
619 MW across 3 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Nisource Inc (100%) and operated by Northern Indiana Pub Serv Co, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit CT01 and Unit CT02 (2002); the newest is Unit ST1 (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Sugar Creek Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $56.7M in 2023.
How much CO₂ does it emit?
1.18 Mt in 2023, reported to the EPA — the 519th highest of 6,030 US facilities that reported. Up from 902,660 t in 2011.