AMERICAN ENERGY ATLAS
Power·Florida

Stock Island

Stock Island, Monroe County, Florida · FMPP · operated by Utility Board of Key West City

last reported to the EPA in 2015

2023 · headline year
Capacity in service126MW7 units · oil
Net generation2.98GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2015
Rank in Florida#60of 310 · by capacity · #2,065 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 37,908 MMBtu · reported

CO₂ emitted, t · 2011–15

02,0004,0006,000201120132015
Reported (through 2015)

Generating units

10 of 10 shown · 126 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT442.0Distillate oilPetroleum Liquids2006Operating
Unit GT123.4Distillate oilPetroleum Liquids1978Operating
Unit GT219.7Distillate oilPetroleum Liquids1999Operating
Unit GT319.7Distillate oilPetroleum Liquids1999Operating
Unit MSD19.6Distillate oilPetroleum Liquids1991Operating
Unit MSD29.6Distillate oilPetroleum Liquids1991Operating
Unit EP22.5Distillate oilPetroleum Liquids2012Operating
Unit IC12.5Distillate oilPetroleum Liquids1965Retired 2009
Unit IC22.5Distillate oilPetroleum Liquids1965Retired 2009
Unit IC32.5Distillate oilPetroleum Liquids1965Retired 2009

All 10 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Utility Board of Key West City
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001058
Balancing authority
FMPP
NERC region
SERC
EIA plant ID
6584

Common questions

How big is Stock Island?
126 MW across 7 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Utility Board of Key West City, filed as municipally owned utility.
Which grid does it sell into?
FMPP (Florida Municipal Power Pool) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating unit is Unit GT1 (1978); the newest is Unit EP2 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Stock Island. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

Florida energyAll facilities in the state→New Hope Power Company129 MW operating capacity→ Mulberry Cogeneration Facility128 MW operating capacity→ Mosaic New Wales Operations126 MW operating capacity→ Orlando CoGen122 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming