AMERICAN ENERGY ATLAS
Power·Florida

Mulberry Cogeneration Facility

Bartow, Polk County, Florida · FPC · operated by Florida Municipal Power Agency · owned by Northern Star Generation LLC

2023 · headline year
Fuel spend$14M2023 · estimate
Capacity in service128MW2 units · gas
Net generation400GWh2023 · reported
CO₂ emitted188,773t2023 · reported to EPA · 1,586th highest of 6,030 in the US
Rank in Florida#59of 310 · by capacity · #2,056 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor36%2023

Location

Polk County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 3.49 TBtu · reported · $14M est.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 128 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT182.0Natural GasNatural Gas Fired Combined Cycle1994Operating
Unit ST145.7Natural GasNatural Gas Fired Combined Cycle1994Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Florida Municipal Power Agency
Jointly held units
Florida Municipal Power Agency <1% of 1 unit
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001275
Balancing authority
FPC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
54426

Common questions

How big is Mulberry Cogeneration Facility?
128 MW across 2 generating units in service.
Who owns and operates it?
Owned by Northern Star Generation LLC and operated by Florida Municipal Power Agency, filed as municipally owned utility. 1 owner stake is filed on jointly held units.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. Every operating unit came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Mulberry Cogeneration Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $14M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
188,773 t in 2023, reported to the EPA — the 1,586th highest of 6,030 US facilities that reported. Down from 193,494 t in 2011.

Related pages

Florida energyAll facilities in the state→J R Kelly142 MW operating capacity→ New Hope Power Company129 MW operating capacity→ Stock Island126 MW operating capacity→ Mosaic New Wales Operations126 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming