AMERICAN ENERGY ATLAS
Power·Nevada

Steamboat Hills LP

Washoe County, Nevada · NEVP · operated by Ormat Nevada Inc

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service37.2MW4 units · geothermal + solar · incl. 3.6 MW online after 2023
Rank in Nevada#58of 111 · by capacity · #3,856 (tied) of 13,147 US

Location

Washoe County · NEVP · WECC

Generating units

6 of 6 shown · 37.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit OEC5125.7GeothermalGeothermal2020Operating
Unit OEC525.9GeothermalGeothermal2020Operating
Unit SBSL23.6SolarSolar Photovoltaic2024Operating
Unit SBSOL2.0SolarSolar Photovoltaic2022Operating
Unit GEN116.3GeothermalGeothermal1988Retired 2020
Unit OEC415.5GeothermalGeothermal2007Retired 2020

All 6 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →

Ownership & operations

Operating utility
Ormat Nevada Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
NEVP
NERC region
WECC
EIA plant ID
50654

Common questions

How big is Steamboat Hills LP?
37.2 MW across 4 generating units in service — 31.6 MW of geothermal and 5.6 MW of solar. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Ormat Nevada Inc, filed as independent power producer.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating units are Unit OEC51 and Unit OEC52 (2020); the newest is Unit SBSL2 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Steamboat Hills LP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Geothermal (31.6 MW) and Solar Photovoltaic (5.6 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (geothermal and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Nevada energyAll facilities in the state→Techren Solar V50.0 MW operating capacity→ CM4848.0 MW operating capacity→ North Valley37.0 MW operating capacity→ Tuscarora Geothermal Power Plant32.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming