Las Vegas, Clark County, Nevada · NEVP · operated by Nevada Power Co · owned by Berkshire Hathaway Inc
2023 · headline year
The 3rd-largest power plant in Nevada by capacity — 1,120 MW, 100% natural gas by fuel energy in 2023, first unit online in 2004, newest in 2024.
Reported fuel cost$159M2023 · reported deliveries
Capacity in service1,120MW5 units · gas · incl. 456 MW online after 2023
Net generation2.57TWh2023 · reported
CO₂ emitted1.01Mt2023 · reported to EPA · 593rd highest of 6,030 in the US
Rank in Nevada#3of 111 · by capacity · #262 of 13,147 US
Reported suppliers12023 · 12 deliveries
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 18.6 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 1,120 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST1
270.3
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CT3
227.8
Natural Gas
Natural Gas Fired Combustion Turbine
2024
Operating
Unit CT4
227.8
Natural Gas
Natural Gas Fired Combustion Turbine
2024
Operating
Unit CT1
197.2
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CT2
197.2
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 145 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Berkshire Hathaway Inc (100%) and operated by Nevada Power Co, filed as investor-owned utility.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012. The oldest operating units are Unit ST1, Unit CT1 and Unit CT2 (2004); the newest are Unit CT3 and Unit CT4 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Silverhawk. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $159M in 2023.
How much CO₂ does it emit?
1.01 Mt in 2023, reported to the EPA — the 593rd highest of 6,030 US facilities that reported. Up from 842,865 t in 2011.