Aberdeen, Grays Harbor County, Washington · BPAT · operated by Sierra Pacific Industries
last reported to the EPA in 2019
2023 · headline year
Capacity in service18.0MW1 unit · biomass
Net generation105GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2019
Rank in Washington#86of 128 · by capacity · #4,745 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor67%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Biomass · 2.01 TBtu · reported
CO₂ emitted, t · 2012–19
Reported (through 2019)
Generating units
1 of 1 shown · 18.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
18.0
Wood
Wood/Wood Waste Biomass
2003
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Sierra Pacific Industries, filed as commercial.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003.
When is it due to retire?
No retirement date has been filed for any operating unit at Sierra Pacific Industries - Aberdeen. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?