Pierce County, Washington · PSEI · operated by Electron Hydro LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 4 | 7.5 | Water | Conventional Hydroelectric | 1929 | Operating |
| Unit 1 | 5.1 | Water | Conventional Hydroelectric | 1904 | Operating |
| Unit 2 | 5.1 | Water | Conventional Hydroelectric | 1904 | Operating |
| Unit 3 | 5.1 | Water | Conventional Hydroelectric | 1904 | Operating |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →