Riviera Beach, Palm Beach County, Florida · FPL · operated by Florida Power & Light Co · owned by Nextera Energy Inc
2023 · headline year
Reported fuel cost$205M2023 · reported deliveries
Capacity in service1,295MW4 units · gas
Net generation7.26TWh2023 · reported
CO₂ emitted2.51Mt2023 · reported to EPA · 222nd highest of 6,030 in the US
Rank in Florida#20 (tied)of 310 · by capacity · #196 (tied) of 13,147 US
Reported suppliers22023 · 15 deliveries
Capacity factor64%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 48.1 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,295 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 5ST
500.0
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit 5A
265.0
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit 5B
265.0
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit 5C
265.0
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit 3
310.4
Residual oil
Petroleum Liquids
1962
Retired 2011
Unit 4
310.4
Residual oil
Petroleum Liquids
1963
Retired 2011
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 130 deliveries recorded 2014–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,295 MW across 4 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Nextera Energy Inc (100%) and operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. Every operating unit came online in 2014.
When is it due to retire?
No retirement date has been filed for any operating unit at Riviera. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $205M in 2023.
How much CO₂ does it emit?
2.51 Mt in 2023, reported to the EPA — the 222nd highest of 6,030 US facilities that reported. Up from 0 t in 2011.