Fuel spend$02023 · no purchased fuel
Capacity in service11.0MW2 units · solar + storage
Rank in Alabama#66of 75 · by capacity · #5,263 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Redstone Arsenal Hybrid?
11.0 MW across 2 generating units in service — 10.0 MW of solar and 1.0 MW of storage.
Who owns and operates it?
Operated by MN8 Energy LLC, filed as independent power producer.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. Every operating unit came online in 2017.
When is it due to retire?
No retirement date has been filed for any operating unit at Redstone Arsenal Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (10.0 MW) and Batteries (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.