AMERICAN ENERGY ATLAS
Industrial + power·Alabama

Onshore Treating Facility

Theodore, Mobile County, Alabama · SOCO · operated by W&T Offshore Inc · owned by W&T Offshore Inc

2023 · headline year
Capacity in service12.0MW4 units · gas
Net generation47.6GWh2023 · reported
CO₂ emitted108,635t2023 · reported to EPA · 2,284th highest of 6,030 in the US
Rank in Alabama#65of 75 · by capacity · #5,143 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor45%2023

Location

Mobile County · SOCO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 672,624 MMBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 12.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 901A3.7Natural GasNatural Gas Fired Combined Cycle1993Operating
Unit 901B3.7Natural GasNatural Gas Fired Combined Cycle1993Operating
Unit 901C3.7Natural GasNatural Gas Fired Combined Cycle1993Operating
Unit 9010.9Natural GasNatural Gas Fired Combined Cycle1993Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
W&T Offshore Inc · 100%
Operating utility
W&T Offshore Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Petroleum and Natural Gas Systems
EPA facility ID
1006148
Balancing authority
SOCO
NERC region
SERC
EIA plant ID
54550

Common questions

How big is Onshore Treating Facility?
12.0 MW across 4 generating units in service.
Who owns and operates it?
Owned by W&T Offshore Inc (100%) and operated by W&T Offshore Inc, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. Every operating unit came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at Onshore Treating Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much CO₂ does it emit?
108,635 t in 2023, reported to the EPA — the 2,284th highest of 6,030 US facilities that reported. Down from 192,613 t in 2011.

Related pages

Alabama energyAll facilities in the state→Resolute Forest Product - Coosa Pines Operation25.9 MW operating capacity→ Cumblerland Land Holdings, LLC14.7 MW operating capacity→ Redstone Arsenal Hybrid11.0 MW operating capacity→ Fort Rucker Solar Array10.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming