AMERICAN ENERGY ATLAS
Power·Illinois

Red Bud

Randolph County, Illinois · MISO · operated by City of Red Bud - (IL)

2023 · headline year
Fuel spend$23,8072023 · estimate
Capacity in service15.0MW6 units · oil
Net generation123MWh2023 · reported
Rank in Illinois#140 (tied)of 433 · by capacity · #4,912 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Randolph County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 1,129 MMBtu · reported · $23,807 est.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 15.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 43.5Distillate oilPetroleum Liquids1973Operating
Unit 72.8Distillate oilPetroleum Liquids2002Operating
Unit 82.8Distillate oilPetroleum Liquids2002Operating
Unit 12.4Distillate oilPetroleum Liquids1968Operating
Unit 32.4Distillate oilPetroleum Liquids1964Operating
Unit 21.1Distillate oilPetroleum Liquids1959Operating
Unit 61.0Distillate oilPetroleum Liquids1953Retired 2001
Unit 50.5Distillate oilPetroleum Liquids1948Retired 2001

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Red Bud - (IL)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
959

Common questions

How big is Red Bud?
15.0 MW across 6 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Red Bud - (IL), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. The oldest operating unit is Unit 2 (1959); the newest are Unit 7 and Unit 8 (2002).
When is it due to retire?
No retirement date has been filed for any operating unit at Red Bud. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $23,807 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Illinois energyAll facilities in the state→Breese16.0 MW operating capacity→ Livingston Landfill15.0 MW operating capacity→ Rantoul14.4 MW operating capacity→ City of Peru Plank Road Generating Station13.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming