AMERICAN ENERGY ATLAS
Power·Illinois

Breese

Clinton County, Illinois · MISO · operated by City of Breese - (IL)

2023 · headline year
Fuel spend$172,1762023 · estimate
Capacity in service16.0MW6 units · oil · 1 more on standby or out of service
Net generation264MWh2023 · reported
Rank in Illinois#139of 433 · by capacity · #4,850 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Clinton County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 8,165 MMBtu · reported · $172,176 est.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 16.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 23.0Distillate oilPetroleum Liquids1982Operating
Unit IC33.0Distillate oilPetroleum Liquids1968Operating
Unit 52.5Distillate oilPetroleum Liquids1992Operating
Unit 62.5Distillate oilPetroleum Liquids1997Operating
Unit 72.5Distillate oilPetroleum Liquids2008Operating
Unit 82.5Distillate oilPetroleum Liquids2014Operating
Unit IC10.9Distillate oilPetroleum Liquids1953Standby
Unit ST22.0Distillate oilPetroleum Liquids1960Retired 2003

All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Breese - (IL)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Ameren Illinois
EIA plant ID
934

Common questions

How big is Breese?
16.0 MW across 6 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Breese - (IL), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1992. The oldest operating unit is Unit IC3 (1968); the newest is Unit 8 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at Breese. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $172,176 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Illinois energyAll facilities in the state→Marshall (IL)16.9 MW operating capacity→ City of Peru Water Street Generating Sta16.3 MW operating capacity→ Livingston Landfill15.0 MW operating capacity→ Red Bud15.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming