Fuel spend$02023 · no purchased fuel
Capacity in service277MW3 units · solar + storage
Rank in California#81of 1,713 · by capacity · #1,094 of 13,147 US
All 3 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
See the engineering record →
How big is RE Tranquillity?
277 MW across 3 generating units in service — 205 MW of solar and 72.0 MW of storage.
Who owns and operates it?
Operated by Southern Power Co, filed as investor-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating unit is Unit TQ (2016); the newest is Unit BESS2 (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at RE Tranquillity. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (205 MW) and Batteries (72.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.