Rawhide Energy Station

Wellington, Larimer County, Colorado · PSCO · operated by Platte River Power Authority · owned by Platte River Power Authority

2023 · headline year
Fuel spend$34M2023 · estimate
Capacity in service800MW6 units · gas + coal
Net generation1.5TWh2023 · reported
CO₂ emitted1.45Mt2023 · reported to EPA · 424th highest of 6,030 in the US
Rank in Colorado#5of 303 · by capacity · #408 of 13,147 US
Reported suppliers32023 · 28 deliveries
Capacity factor21%2023

Location

Larimer County · PSCO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

85% Coal · 13.7 TBtu · reported · $24.1M est.15% Natural gas · 2.42 TBtu · reported · $9.52M est.

Coal supplies 85% of the fuel energy it burned in 2023. Per unit of heat, natural gas costs Rawhide Energy Station an estimated 2.2× more than coal.

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

11 of 11 shown · 800 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1293.6SubbituminousConventional Steam Coal1984Operating
Unit F149.6Natural GasNatural Gas Fired Combustion Turbine2008Operating
Unit A89.3Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit B89.3Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit C89.3Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit D89.3Natural GasNatural Gas Fired Combustion Turbine2004Operating
Unit G44.6Natural GasNatural Gas Fired Combustion Turbine2028Proposed
Unit H44.6Natural GasNatural Gas Fired Combustion Turbine2028Proposed
Unit LM344.6Natural GasNatural Gas Fired Combustion Turbine2028Proposed
Unit LM444.6Natural GasNatural Gas Fired Combustion Turbine2028Proposed
Unit LM544.6Natural GasNatural Gas Fired Combustion Turbine2028Proposed

All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit Gnew unit202844.6 MW
Unit Hnew unit202844.6 MW
Unit LM3new unit202844.6 MW
Unit LM4new unit202844.6 MW
Unit LM5new unit202844.6 MW
Unit 1retirement2029-12294 MW

Who supplies the fuel

1 of 3 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Navajo Transitional Energy Co., LLCCoal13.4755,308Antelope Coal Mine, WyomingRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 308 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 3 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Platte River Power Authority · 100%
Operating utility
Platte River Power Authority
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001062
Balancing authority
PSCO
NERC region
WECC
Gas pipeline
Pub Service Co of Colorado
EIA plant ID
6761

Common questions

How big is Rawhide Energy Station?
800 MW across 6 generating units in service — 507 MW of natural gas and 294 MW of coal. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Platte River Power Authority (100%) and operated by Platte River Power Authority, filed as political subdivision.
Which grid does it sell into?
PSCO (Public Service Company of Colorado) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating unit is Unit 1 (1984); the newest is Unit F (2008).
When is it due to retire?
Planned retirement dates are filed for 1 of 6 operating units: Unit 1 (2029).
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas. Coal delivered in 2023 came from 1 coal supplier, from mines in Wyoming — principally Antelope Coal Mine. Other fuels (natural gas and oil & petroleum) came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $34M in 2023 — coal $24.1M, natural gas $9.52M and oil & petroleum $377,415. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.45 Mt in 2023, reported to the EPA — the 424th highest of 6,030 US facilities that reported. Down from 2.15 Mt in 2011.

Also at this site

Rawhide Prairie Solar HybridSame site · operating→

Related pages

Colorado energyAll facilities in the state→Fort St. Vrain1,148 MW operating capacity→ Cherokee1,006 MW operating capacity→ Rocky Mountain Energy Center685 MW operating capacity→ Rush Creek Wind600 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming