Platteville, Weld County, Colorado · PSCO · operated by Public Service Co of Colorado · owned by Xcel Energy Inc
2023 · headline year
The 3rd-largest power plant in Colorado by capacity — 1,148 MW, 100% natural gas by fuel energy in 2023, first unit online in 1996, newest in 2009.
Reported fuel cost$110M2023 · reported deliveries
Capacity in service1,148MW6 units · gas
Net generation4.1TWh2023 · reported
CO₂ emitted1.67Mt2023 · reported to EPA · 361st highest of 6,030 in the US
Rank in Colorado#3of 303 · by capacity · #255 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor41%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 29.9 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,148 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
342.6
Natural Gas
Natural Gas Fired Combined Cycle
1998
Operating
Unit 2
175.1
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit 3
175.1
Natural Gas
Natural Gas Fired Combined Cycle
1999
Operating
Unit 4
175.1
Natural Gas
Natural Gas Fired Combined Cycle
2001
Operating
Unit 5
140.3
Natural Gas
Natural Gas Fired Combustion Turbine
2009
Operating
Unit 6
140.3
Natural Gas
Natural Gas Fired Combustion Turbine
2009
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Owned by Xcel Energy Inc (100%) and operated by Public Service Co of Colorado, filed as investor-owned utility.
Which grid does it sell into?
PSCO (Public Service Company of Colorado) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2001. The oldest operating unit is Unit 2 (1996); the newest are Unit 5 and Unit 6 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Fort St. Vrain. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $110M in 2023.
How much CO₂ does it emit?
1.67 Mt in 2023, reported to the EPA — the 361st highest of 6,030 US facilities that reported. Up from 1.47 Mt in 2011.