AMERICAN ENERGY ATLAS
Industrial + power·California

Puente Hills Landfill and Energy Recovery

Whittier, Los Angeles County, California · CAISO · operated by Los Angeles County Sanitation · owned by County of Los Angeles California

2023 · headline year
Capacity in service50.0MW1 unit · biomass
Net generation164GWh2023 · reported
CO₂ emitted62,140t2023 · reported to EPA · 3,273rd highest of 6,030 in the US
Rank in California#379 (tied)of 1,713 · by capacity · #3,450 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor37%2023

Location

Los Angeles County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 2.15 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 50.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN150.0Landfill gasLandfill Gas1986Operating
Unit GEN33.3Landfill gasLandfill Gas2006Retired 2016
Unit GEN43.3Landfill gasLandfill Gas2006Retired 2016
Unit GEN53.3Landfill gasLandfill Gas2006Retired 2016
Unit GEN22.8Landfill gasLandfill Gas1984Retired 2013

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
County of Los Angeles California · 100%
Operating utility
Los Angeles County Sanitation
Entity type
Political Subdivision
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1003199
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
10472

Common questions

How big is Puente Hills Landfill and Energy Recovery?
50.0 MW across 1 generating unit in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by County of Los Angeles California (100%) and operated by Los Angeles County Sanitation, filed as political subdivision.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986.
When is it due to retire?
No retirement date has been filed for any operating unit at Puente Hills Landfill and Energy Recovery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much CO₂ does it emit?
62,140 t in 2023, reported to the EPA — the 3,273rd highest of 6,030 US facilities that reported. Down from 431,507 t in 2011.

Related pages

California energyAll facilities in the state→Tiger Creek52.2 MW operating capacity→ Goal Line LP51.4 MW operating capacity→ Npca Combustion Turbine Project #250.0 MW operating capacity→ Alpaugh 5050.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming