Escondido, San Diego County, California · CAISO · operated by Goal Line LP
last reported to the EPA in 2019
2023 · headline year
Capacity in service51.4MW2 units · gas
Net generation13.6GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2019
Rank in California#378of 1,713 · by capacity · #3,415 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor3%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 124,073 MMBtu · reported
CO₂ emitted, t · 2011–19
Reported (through 2019)
Generating units
2 of 2 shown · 51.4 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit CTG
41.2
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
Unit STG
10.2
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Goal Line LP, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. Every operating unit came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Goal Line LP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?