Pueblo, Pueblo County, Colorado · PSCO · operated by Black Hills Service Company LLC · owned by Black Hills Corp
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GT1 | 100.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2012 | Operating |
| Unit GT2 | 100.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2012 | Operating |
| Unit 4 | 40.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit 5 | 40.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit 6 | 40.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit 7 | 40.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit CT08 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2016 | Operating |
| Unit 43 | 20.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit 53 | 20.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2012 | Operating |
| Unit BA7 | 50.0 | Storage | Batteries | 2027 | Planned |
| Unit GT3 | 100.0 | Natural Gas | Natural Gas Fired Combustion Turbine | not reported | Canceled |
All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BA7 | new unit | 2027 | 50.0 MW |
| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Black Hills Energy | Natural gas | 14.2 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 144 deliveries recorded 2012–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →