Fuel spend$02023 · no purchased fuel
Capacity in service450MW2 units · solar + storage
Rank in Colorado#13of 303 · by capacity · #763 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Neptune Energy Center Hybrid?
450 MW across 2 generating units in service — 325 MW of solar and 125 MW of storage.
Who owns and operates it?
Operated by Neptune Energy Center, LLC, filed as independent power producer.
Which grid does it sell into?
PSCO (Public Service Company of Colorado) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Neptune Energy Center Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (325 MW) and Batteries (125 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.