Salisbury, Rowan County, North Carolina · DUK · operated by Southern Power Co · owned by The Southern Co
2023 · headline year
Fuel spend$163M2023 · estimate
Capacity in service1,192MW6 units · gas
Net generation4.32TWh2023 · reported
CO₂ emitted1.68Mt2023 · reported to EPA · 360th highest of 6,030 in the US
Rank in North Carolina#10of 908 · by capacity · #233 (tied) of 13,147 US
Reported suppliers92023 · 24 deliveries
Capacity factor41%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 30.5 TBtu · reported · $163M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,192 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 001
199.4
Natural Gas
Natural Gas Fired Combustion Turbine
2001
Operating
Unit 002
199.4
Natural Gas
Natural Gas Fired Combustion Turbine
2001
Operating
Unit 003
199.4
Natural Gas
Natural Gas Fired Combustion Turbine
2001
Operating
Unit 4
199.4
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit 5
199.4
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit STG
195.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 9 suppliers. Subscribe to see all 9, every one of the 194 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by The Southern Co (100%) and operated by Southern Power Co, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit 001, Unit 002 and Unit 003 (2001); the newest are Unit 4, Unit 5 and Unit STG (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Plant Rowan County. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 9 suppliers in 2023.
How much does it spend on fuel?
An estimated $163M in 2023 — natural gas $163M and oil & petroleum $62,576. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.68 Mt in 2023, reported to the EPA — the 360th highest of 6,030 US facilities that reported. Up from 1.03 Mt in 2011.