Arden, Buncombe County, North Carolina · CPLE · operated by Duke Energy Progress - (NC) · owned by Duke Energy Corp
2023 · headline year
Reported fuel cost$166M2023 · reported deliveries
Capacity in service1,012MW6 units · gas
Net generation3.88TWh2023 · reported
CO₂ emitted1.46Mt2023 · reported to EPA · 423rd highest of 6,030 in the US
Rank in North Carolina#11of 908 · by capacity · #303 of 13,147 US
Reported suppliers62023 · 31 deliveries
Capacity factor44%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 26.5 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 1,012 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GT2
211.8
Natural Gas
Natural Gas Fired Combustion Turbine
2000
Operating
Unit GT1
211.7
Natural Gas
Natural Gas Fired Combustion Turbine
1999
Operating
Unit CT5
191.2
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
Unit CT7
191.2
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit ST6
102.8
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
Unit ST8
102.8
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit 2
207.0
Bituminous coal
Conventional Steam Coal
1971
Retired 2020
Unit 1
206.6
Bituminous coal
Conventional Steam Coal
1964
Retired 2020
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 6 suppliers. Subscribe to see all 6, every one of the 539 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,012 MW across 6 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Progress - (NC), filed as investor-owned utility.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. The oldest operating unit is Unit GT1 (1999); the newest are Unit CT7 and Unit ST8 (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Asheville Steam Electric Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 6 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $166M in 2023.
How much CO₂ does it emit?
1.46 Mt in 2023, reported to the EPA — the 423rd highest of 6,030 US facilities that reported. Down from 1.74 Mt in 2011.