Plant No 2 Orange County

Orange County, California · CAISO · operated by Orange County Sanitation Dist

2023 · headline year
Fuel spend$1.98M2023 · estimate
Capacity in service16.0MW6 units · biomass + other sources
Net generation59GWh2023 · reported
Rank in California#680 (tied)of 1,713 · by capacity · #4,850 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor42%2023

Location

Orange County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

78% Landfill gas · 517,816 MMBtu · reported22% Natural gas · 145,360 MMBtu · reported · $1.98M est.

Landfill gas supplies 78% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 16.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN13.0BiogasOther Waste Biomass1993Operating
Unit GEN23.0BiogasOther Waste Biomass1993Operating
Unit GEN33.0BiogasOther Waste Biomass1993Operating
Unit GEN43.0BiogasOther Waste Biomass1993Operating
Unit GEN53.0BiogasOther Waste Biomass1993Operating
Unit GEN61.0OtherAll Other1993Operating

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Orange County Sanitation Dist
Entity type
Political Subdivision
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
52099

Common questions

How big is Plant No 2 Orange County?
16.0 MW across 6 generating units in service — 15.0 MW of biomass and 1.0 MW of other sources.
Who owns and operates it?
Operated by Orange County Sanitation Dist, filed as political subdivision.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. Every operating unit came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at Plant No 2 Orange County. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $1.98M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Sand Bar Power Plant16.2 MW operating capacity→ North Brawley Geothermal Plant16.0 MW operating capacity→ CED Avenal15.8 MW operating capacity→ EDF Renewable Windfarm V Inc15.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming