Chillicothe, Ross County, Ohio · PJM · operated by Pixelle Specialty Solution, LLC · owned by Pixelle Specialty Solutions LLC
2023 · headline year
Fuel spend$40.5M2023 · estimate
Capacity in service82.2MW3 units · biomass + gas · 1 more on standby or out of service
Net generation292GWh2023 · reported
CO₂ emitted312,941t2023 · reported to EPA · 1,209th highest of 6,030 in the US
Rank in Ohio#53of 189 · by capacity · #2,685 of 13,147 US
Reported suppliers22023 · 24 deliveries
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
58% Black liquor · 6.67 TBtu · reported41% Natural gas · 4.7 TBtu · reported · $37.1M est.1% Oil & petroleum · 0.145 TBtu · reported · $3.39M est.
Black liquor supplies 58% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 82.2 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit T-12
31.0
Black liquor
Wood/Wood Waste Biomass
1967
Operating
Unit T-13
27.2
Natural Gas
Natural Gas Steam Turbine
1978
Operating
Unit T-11
24.0
Black liquor
Wood/Wood Waste Biomass
1958
Operating
Unit T-10
10.6
Black liquor
Wood/Wood Waste Biomass
1952
Out of service
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 428 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
82.2 MW across 3 generating units in service — 55.0 MW of biomass and 27.2 MW of natural gas. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1968. The oldest operating unit is Unit T-11 (1958); the newest is Unit T-13 (1978).
When is it due to retire?
No retirement date has been filed for any operating unit at Pixelle Specialty Solutions LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor, natural gas and oil & petroleum. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $40.5M in 2023 — natural gas $37.1M and oil & petroleum $3.39M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
312,941 t in 2023, reported to the EPA — the 1,209th highest of 6,030 US facilities that reported. Down from 742,100 t in 2011.