Cleveland, Cuyahoga County, Ohio · PJM · operated by Cleveland Cliffs · owned by Cleveland-Cliffs Inc
2023 · headline year
Capacity in service80.0MW2 units · gas · 1 more on standby or out of service
Net generation144GWh2023 · reported
CO₂ emitted4.27Mt2023 · reported to EPA · 89th highest of 6,030 in the US
Rank in Ohio#54 (tied)of 189 · by capacity · #2,714 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
68% Process gas · 3.01 TBtu · reported32% Natural gas · 1.43 TBtu · reported
Process gas supplies 68% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 80.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GENG
70.0
Blast-furnace gas
Other Gases
2022
Operating
Unit GENC
22.0
Blast-furnace gas
Other Gases
2010
Out of service
Unit GENB
10.0
Blast-furnace gas
Other Gases
1965
Operating
Unit GENA
15.0
Blast-furnace gas
Other Gases
1950
Retired 2023
Unit GEN3
10.0
Blast-furnace gas
Other Gases
1965
Retired 2023
Unit GEN5
10.0
Blast-furnace gas
Other Gases
1965
Retired 2023
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
80.0 MW across 2 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Cleveland-Cliffs Inc (100%) and operated by Cleveland Cliffs, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. The oldest operating unit is Unit GENB (1965); the newest is Unit GENG (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at Cleveland-Cliffs Cleveland Works LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned process gas and natural gas.
How much CO₂ does it emit?
4.27 Mt in 2023, reported to the EPA — the 89th highest of 6,030 US facilities that reported. Up from 3.73 Mt in 2011.