AMERICAN ENERGY ATLAS
Power·North Dakota

Pioneer Generating Station

Williston, Williams County, North Dakota · SPP · operated by Basin Electric Power Coop · owned by Basin Electric Power Cooperative

2023 · headline year
Reported fuel cost$42.7M2023 · reported deliveries
Capacity in service293MW15 units · gas
Net generation1.51TWh2023 · reported
CO₂ emitted260,040t2023 · reported to EPA · 1,333rd highest of 6,030 in the US
Rank in North Dakota#9of 55 · by capacity · #1,053 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor59%2023

Location

Williams County · SPP · MRO

CO₂ emitted, t · 2013–2023

0200,000400,000600,000201320182023
Reported (through 2023)

Generating units

23 of 23 shown · 293 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 0160.5Natural GasNatural Gas Fired Combustion Turbine2013Operating
Unit 0260.5Natural GasNatural Gas Fired Combustion Turbine2014Operating
Unit 0360.5Natural GasNatural Gas Fired Combustion Turbine2014Operating
Unit 119.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 129.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 139.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 149.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 159.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 169.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 179.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 189.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 199.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 209.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 219.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 229.3Natural GasNatural Gas Internal Combustion Engine2017Operating
Unit 04245.7Natural GasNatural Gas Fired Combustion Turbine2025Proposed
Unit 05245.7Natural GasNatural Gas Fired Combustion Turbine2025Proposed
Unit 3118.8Natural GasNatural Gas Internal Combustion Engine2025Proposed
Unit 3218.8Natural GasNatural Gas Internal Combustion Engine2025Proposed
Unit 3318.8Natural GasNatural Gas Internal Combustion Engine2025Proposed
Unit 3418.8Natural GasNatural Gas Internal Combustion Engine2025Proposed
Unit 3518.8Natural GasNatural Gas Internal Combustion Engine2025Proposed
Unit 3618.8Natural GasNatural Gas Internal Combustion Engine2025Proposed

All 23 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 04new unit2025246 MW
Unit 05new unit2025246 MW
Unit 31new unit202518.8 MW
Unit 32new unit202518.8 MW
Unit 33new unit202518.8 MW
Unit 34new unit202518.8 MW
Unit 35new unit202518.8 MW
Unit 36new unit202518.8 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 96 deliveries are on record for 2016–2023.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Basin Electric Power Cooperative · 100%
Operating utility
Basin Electric Power Coop
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1011315
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Wbi Energy Transmission Inc
EIA plant ID
57881

Common questions

How big is Pioneer Generating Station?
293 MW across 15 generating units in service. A further 8 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Basin Electric Power Cooperative (100%) and operated by Basin Electric Power Coop, filed as cooperative.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. The oldest operating unit is Unit 01 (2013); the newest are Unit 11, Unit 12, Unit 13, Unit 14 and 8 more (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Pioneer Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $42.7M in 2023.
How much CO₂ does it emit?
260,040 t in 2023, reported to the EPA — the 1,333rd highest of 6,030 US facilities that reported. Up from 9,700 t in 2013.

Related pages

North Dakota energyAll facilities in the state→Lonesome Creek Station363 MW operating capacity→ Aurora Wind Project299 MW operating capacity→ Bison 4 Wind Energy Center205 MW operating capacity→ Courtenay Wind Farm200 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming