AMERICAN ENERGY ATLAS
Power·North Dakota

Lonesome Creek Station

Alexander, Mckenzie County, North Dakota · SPP · operated by Basin Electric Power Coop · owned by Basin Electric Power Cooperative

2023 · headline year
Reported fuel cost$27.1M2023 · reported deliveries
Capacity in service363MW6 units · gas
Net generation1.16TWh2023 · reported
CO₂ emitted594,890t2023 · reported to EPA · 851st highest of 6,030 in the US
Rank in North Dakota#7of 55 · by capacity · #866 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor36%2023

Location

Mckenzie County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 11.4 TBtu · reported

CO₂ emitted, t · 2013–2023

0200,000400,000600,000201320182023
Reported (through 2023)

Generating units

6 of 6 shown · 363 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 0160.5Natural GasNatural Gas Fired Combustion Turbine2013Operating
Unit 0260.5Natural GasNatural Gas Fired Combustion Turbine2015Operating
Unit 0360.5Natural GasNatural Gas Fired Combustion Turbine2015Operating
Unit 0460.5Natural GasNatural Gas Fired Combustion Turbine2017Operating
Unit 0560.5Natural GasNatural Gas Fired Combustion Turbine2017Operating
Unit 0660.5Natural GasNatural Gas Fired Combustion Turbine2021Operating

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 96 deliveries are on record for 2016–2023.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Basin Electric Power Cooperative · 100%
Operating utility
Basin Electric Power Coop
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1011323
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Northern Border P L Co
EIA plant ID
57943

Common questions

How big is Lonesome Creek Station?
363 MW across 6 generating units in service.
Who owns and operates it?
Owned by Basin Electric Power Cooperative (100%) and operated by Basin Electric Power Coop, filed as cooperative.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. The oldest operating unit is Unit 01 (2013); the newest is Unit 06 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Lonesome Creek Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $27.1M in 2023.
How much CO₂ does it emit?
594,890 t in 2023, reported to the EPA — the 851st highest of 6,030 US facilities that reported. Up from 2,687 t in 2013.

Related pages

North Dakota energyAll facilities in the state→Garrison583 MW operating capacity→ Coyote450 MW operating capacity→ Aurora Wind Project299 MW operating capacity→ Pioneer Generating Station293 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming