AMERICAN ENERGY ATLAS
Power·California

Pine Flat

Fresno County, California · CAISO · operated by Kings River Conservation Dist

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service165MW3 units · hydro
Rank in California#147 (tied)of 1,713 · by capacity · #1,718 (tied) of 13,147 US

Location

Fresno County · CAISO · WECC

Generating units

4 of 4 shown · 165 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 155.0WaterConventional Hydroelectric1984Operating
Unit 255.0WaterConventional Hydroelectric1984Operating
Unit 355.0WaterConventional Hydroelectric1984Operating
Unit 43.8WaterConventional Hydroelectric2027Proposed

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 4new unit20273.8 MW

Ownership & operations

Operating utility
Kings River Conservation Dist
Entity type
Political Subdivision
Regulatory status
Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
7907

Common questions

How big is Pine Flat?
165 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Kings River Conservation Dist, filed as political subdivision.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. Every operating unit came online in 1984.
When is it due to retire?
No retirement date has been filed for any operating unit at Pine Flat. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Conventional Hydroelectric (165 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→PG&E Humboldt Bay167 MW operating capacity→ Roseville Energy Park165 MW operating capacity→ Resurgence Solar165 MW operating capacity→ Solar Gen 2 Solar Facility163 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming