AMERICAN ENERGY ATLAS
Power·California

Oroville Cogeneration LP

Butte County, California · CAISO · operated by Apex Power Generation Corp.

2023 · headline year
Fuel spend$55,4882023 · estimate
Capacity in service6.6MW6 units · gas · 1 more on standby or out of service
Net generation235MWh2023 · reported
Rank in California#825 (tied)of 1,713 · by capacity · #6,214 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Butte County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 4,077 MMBtu · reported · $55,488 est.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 6.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN11.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN21.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN31.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN41.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN51.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN61.1Natural GasNatural Gas Internal Combustion Engine1990Operating
Unit GEN71.1Natural GasNatural Gas Internal Combustion Engine1990Out of service

All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Apex Power Generation Corp.
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
54477

Common questions

How big is Oroville Cogeneration LP?
6.6 MW across 6 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Apex Power Generation Corp., filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1990. Every operating unit came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at Oroville Cogeneration LP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $55,488 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→MM West Covina6.8 MW operating capacity→ South6.7 MW operating capacity→ Spaulding 36.6 MW operating capacity→ SunSelect16.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming