Fuel spend$36,2872023 · estimate
Capacity in service6.8MW1 unit · biomass
Net generation39.9GWh2023 · reported
Rank in California#819 (tied)of 1,713 · by capacity · #6,187 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor67%2023
How big is MM West Covina?
6.8 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by MM West Covina Energy LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at MM West Covina. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $36,287 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.