AMERICAN ENERGY ATLAS
Power·California

Oberon II Solar Project

Riverside County, California · CAISO · operated by IP Oberon II, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service375MW2 units · solar + storage
Rank in California#52 (tied)of 1,713 · by capacity · #852 (tied) of 13,147 US

Location

Riverside County · CAISO · WECC

Generating units

2 of 2 shown · 375 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit OBIIP250.0SolarSolar Photovoltaic2023Operating
Unit OBIIB125.0StorageBatteries2023Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
IP Oberon II, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
65735

Common questions

How big is Oberon II Solar Project?
375 MW across 2 generating units in service — 250 MW of solar and 125 MW of storage.
Who owns and operates it?
Operated by IP Oberon II, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Oberon II Solar Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (250 MW) and Batteries (125 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→El Centro388 MW operating capacity→ Magnolia388 MW operating capacity→ Oberon Solar Project375 MW operating capacity→ Arlington Energy Center II365 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming