El Centro, Imperial County, California · IID · operated by Imperial Irrigation District · owned by Imperial Irrigation District
2023 · headline year
Fuel spend$58.3M2023 · estimate
Capacity in service388MW7 units · gas + storage
CO₂ emitted510,179t2023 · reported to EPA · 922nd highest of 6,030 in the US
Rank in California#50of 1,713 · by capacity · #833 of 13,147 US
Reported suppliers12023 · 12 deliveries
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 9.46 TBtu · reported · $58.3M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 388 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 2A
89.9
Natural Gas
Natural Gas Fired Combined Cycle
1993
Operating
Unit 4
81.6
Natural Gas
Natural Gas Steam Turbine
1968
Operating
Unit 30
65.9
Natural Gas
Natural Gas Fired Combined Cycle
2012
Operating
Unit 31
43.2
Natural Gas
Natural Gas Fired Combined Cycle
2012
Operating
Unit 32
43.2
Natural Gas
Natural Gas Fired Combined Cycle
2012
Operating
Unit 2
34.5
Natural Gas
Natural Gas Fired Combined Cycle
1952
Operating
Unit BESS
30.0
Storage
Batteries
2016
Operating
Unit 3
50.0
Natural Gas
Natural Gas Steam Turbine
1957
Retired 2010
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; energy capacity in MWh, charge and discharge rates and use cases.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
388 MW across 7 generating units in service — 358 MW of natural gas and 30.0 MW of storage. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Imperial Irrigation District (100%) and operated by Imperial Irrigation District, filed as political subdivision.
Which grid does it sell into?
IID (Imperial Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. The oldest operating unit is Unit 2 (1952); the newest is Unit BESS (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at El Centro. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $58.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
510,179 t in 2023, reported to the EPA — the 922nd highest of 6,030 US facilities that reported. Up from 412,245 t in 2011.