AMERICAN ENERGY ATLAS
Power·California

El Centro

El Centro, Imperial County, California · IID · operated by Imperial Irrigation District · owned by Imperial Irrigation District

2023 · headline year
Fuel spend$58.3M2023 · estimate
Capacity in service388MW7 units · gas + storage
CO₂ emitted510,179t2023 · reported to EPA · 922nd highest of 6,030 in the US
Rank in California#50of 1,713 · by capacity · #833 of 13,147 US
Reported suppliers12023 · 12 deliveries

Location

Imperial County · IID · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 9.46 TBtu · reported · $58.3M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 388 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2A89.9Natural GasNatural Gas Fired Combined Cycle1993Operating
Unit 481.6Natural GasNatural Gas Steam Turbine1968Operating
Unit 3065.9Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 3143.2Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 3243.2Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 234.5Natural GasNatural Gas Fired Combined Cycle1952Operating
Unit BESS30.0StorageBatteries2016Operating
Unit 350.0Natural GasNatural Gas Steam Turbine1957Retired 2010

All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Southern California GasNatural gas9.46n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Imperial Irrigation District · 100%
Operating utility
Imperial Irrigation District
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001454
Balancing authority
IID
NERC region
WECC
EIA plant ID
389

Common questions

How big is El Centro?
388 MW across 7 generating units in service — 358 MW of natural gas and 30.0 MW of storage. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Imperial Irrigation District (100%) and operated by Imperial Irrigation District, filed as political subdivision.
Which grid does it sell into?
IID (Imperial Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. The oldest operating unit is Unit 2 (1952); the newest is Unit BESS (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at El Centro. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $58.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
510,179 t in 2023, reported to the EPA — the 922nd highest of 6,030 US facilities that reported. Up from 412,245 t in 2011.

Also at this site

Sol Orchard El Centro PVSame site · operating→

Related pages

California energyAll facilities in the state→Pio Pico Energy Center395 MW operating capacity→ Ivanpah Solar Electric Generating Facility393 MW operating capacity→ Magnolia388 MW operating capacity→ Oberon II Solar Project375 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming