AMERICAN ENERGY ATLAS
Power·Texas

Notrees Windpower Hybrid

Ector County, Texas · ERCOT · operated by Duke Energy Renewables Services

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service188MW3 units · wind + storage
Rank in Texas#311of 941 · by capacity · #1,581 of 13,147 US

Location

Ector County · ERCOT · TRE

Generating units

3 of 3 shown · 188 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit VESTA92.5WindOnshore Wind Turbine2009Operating
Unit GE60.0WindOnshore Wind Turbine2009Operating
Unit BATT36.0StorageBatteries2012Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Duke Energy Renewables Services
Jointly held units
DEGS Wind 1 LLC 99% of 3 units
TE Notrees LLC 1% of 3 units
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
56961

Common questions

How big is Notrees Windpower Hybrid?
188 MW across 3 generating units in service — 152 MW of wind and 36.0 MW of storage.
Who owns and operates it?
Operated by Duke Energy Renewables Services, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. The oldest operating units are Unit VESTA and Unit GE (2009); the newest is Unit BATT (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Notrees Windpower Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Onshore Wind Turbine (152 MW) and Batteries (36.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and onshore wind turbine) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→Cunningham Storage190 MW operating capacity→ Castle Gap Solar Hybrid190 MW operating capacity→ Baffin Wind188 MW operating capacity→ Aragorn Solar Project187 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming