Fuel spend$02023 · no purchased fuel
Capacity in service190MW2 units · solar + storage
Rank in Texas#310of 941 · by capacity · #1,577 of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Castle Gap Solar Hybrid?
190 MW across 2 generating units in service — 180 MW of solar and 9.9 MW of storage.
Who owns and operates it?
Operated by Upton County Solar 2 LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit CGAP (2018); the newest is Unit BAT1 (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at Castle Gap Solar Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (180 MW) and Batteries (9.9 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.