AMERICAN ENERGY ATLAS
Power·Texas

Castle Gap Solar Hybrid

Upton County, Texas · ERCOT · operated by Upton County Solar 2 LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service190MW2 units · solar + storage
Rank in Texas#310of 941 · by capacity · #1,577 of 13,147 US

Location

Upton County · ERCOT · TRE

Generating units

2 of 2 shown · 190 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CGAP180.0SolarSolar Photovoltaic2018Operating
Unit BAT19.9StorageBatteries2019Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Upton County Solar 2 LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
60123

Common questions

How big is Castle Gap Solar Hybrid?
190 MW across 2 generating units in service — 180 MW of solar and 9.9 MW of storage.
Who owns and operates it?
Operated by Upton County Solar 2 LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit CGAP (2018); the newest is Unit BAT1 (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at Castle Gap Solar Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (180 MW) and Batteries (9.9 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→Plant X190 MW operating capacity→ Cunningham Storage190 MW operating capacity→ Notrees Windpower Hybrid188 MW operating capacity→ Baffin Wind188 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming