New River

Pulaski County, Virginia · PJM · operated by Ingenco Renewable Development, LLC

2023 · headline year
Fuel spend$189,8012023 · estimate
Capacity in service5.4MW18 units · biomass
Net generation13.7GWh2023 · reported
Rank in Virginia#162 (tied)of 230 · by capacity · #6,501 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor29%2023

Location

Pulaski County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

95% Landfill gas · 170,883 MMBtu · reported5% Oil & petroleum · 9,628 MMBtu · reported · $189,801 est.

Landfill gas supplies 95% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2015–23

0100,000200,000300,000201520192023
Reported (through 2023)

Generating units

18 of 18 shown · 5.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit E10.3Landfill gasLandfill Gas2013Operating
Unit E100.3Landfill gasLandfill Gas2013Operating
Unit E110.3Landfill gasLandfill Gas2013Operating
Unit E120.3Landfill gasLandfill Gas2013Operating
Unit E130.3Landfill gasLandfill Gas2013Operating
Unit E140.3Landfill gasLandfill Gas2013Operating
Unit E150.3Landfill gasLandfill Gas2013Operating
Unit E160.3Landfill gasLandfill Gas2013Operating
Unit E170.3Landfill gasLandfill Gas2013Operating
Unit E180.3Landfill gasLandfill Gas2013Operating
Unit E20.3Landfill gasLandfill Gas2013Operating
Unit E30.3Landfill gasLandfill Gas2013Operating
Unit E40.3Landfill gasLandfill Gas2013Operating
Unit E50.3Landfill gasLandfill Gas2013Operating
Unit E60.3Landfill gasLandfill Gas2013Operating
Unit E70.3Landfill gasLandfill Gas2013Operating
Unit E80.3Landfill gasLandfill Gas2013Operating
Unit E90.3Landfill gasLandfill Gas2013Operating

All 18 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Ingenco Renewable Development, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
59845

Common questions

How big is New River?
5.4 MW across 18 generating units in service.
Who owns and operates it?
Operated by Ingenco Renewable Development, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at New River. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and oil & petroleum.
How much does it spend on fuel?
An estimated $189,801 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Virginia energyAll facilities in the state→Monterey Diesel Generation Facility6.0 MW operating capacity→ Fries Hydroelectric Project5.4 MW operating capacity→ Cunningham Solar LLC5.0 MW operating capacity→ Fairfax Landfill5.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming