Pittsylvania County, Virginia · PJM · operated by Virginia Electric & Power Co
Retired 2019
Retired — its last generating unit went out of service in 2019, ending 90.0 MW of capacity.
Retired capacity90.0MW2 units · none in service
Reported suppliersNot reported2023
Location
Reported fuel consumption, TBtu · 2011–18
Reported (through 2018)
Generating units
2 of 2 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
45.0
Wood
Wood/Wood Waste Biomass
1994
Retired 2019
Unit GEN2
45.0
Wood
Wood/Wood Waste Biomass
1994
Retired 2019
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.