AMERICAN ENERGY ATLAS
Power·Virginia

Moseley Hermon Solar

Chesterfield County, Virginia · PJM · operated by Moseley Hermon Solar

Capacity shown is planned or not in service

Proposed

A planned 5.0 MW solar photovoltaic project, filed to come online in 2025.

Planned capacity5.0MW1 unit · not yet in service

Location

Chesterfield County · PJM · SERC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 393025.0SolarSolar Photovoltaic2025Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 39302new unit20255.0 MW

Ownership & operations

Operating utility
Moseley Hermon Solar
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
68971

Common questions

How big is Moseley Hermon Solar?
5.0 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Moseley Hermon Solar, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
What does it run on?
Solar Photovoltaic (5.0 MW).

Related pages

Virginia energyAll facilities in the state→MM Prince William EnergyPower facility→ Moon Corner SolarPower facility→ Multitrade of Pittsylvania LPPower facility→ New River Resource Authority Solid Waste Management FacilityIndustrial facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming