AMERICAN ENERGY ATLAS
Power·Minnesota

Mountain Lake

Cottonwood County, Minnesota · MISO · operated by City of Mountain Lake - (MN)

2023 · headline year
Fuel spend$29,8502023 · estimate
Capacity in service7.2MW5 units · oil + gas + wind
Rank in Minnesota#150 (tied)of 767 · by capacity · #6,110 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Cottonwood County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

89% Natural gas · 3,902 MMBtu · reported · $19,287 est.11% Oil & petroleum · 494 MMBtu · reported · $10,563 est.

Natural gas supplies 89% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Mountain Lake an estimated 4.3× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 7.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 61.8Distillate oilPetroleum Liquids1998Operating
Unit 71.8Distillate oilPetroleum Liquids1998Operating
Unit 51.3Natural GasNatural Gas Internal Combustion Engine1959Operating
Unit 81.2WindOnshore Wind Turbine2007Operating
Unit 21.1Natural GasNatural Gas Internal Combustion Engine1954Operating
Unit 42.0Distillate oilPetroleum Liquids1968Retired 2023

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times; turbine manufacturer, turbine count and hub height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Mountain Lake - (MN)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
1998

Common questions

How big is Mountain Lake?
7.2 MW across 5 generating units in service — 3.6 MW of oil, 2.4 MW of natural gas and 1.2 MW of wind. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Mountain Lake - (MN), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. The oldest operating unit is Unit 2 (1954); the newest is Unit 8 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Mountain Lake. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $29,850 in 2023 — natural gas $19,287 and oil & petroleum $10,563. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Minnesota energyAll facilities in the state→Connexus Solar Stanford 1STF7.3 MW operating capacity→ Melrose7.2 MW operating capacity→ Springfield (MN)7.2 MW operating capacity→ Spring Valley7.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming