AMERICAN ENERGY ATLAS
Power·Minnesota

Connexus Solar Stanford 1STF

Anoka County, Minnesota · MISO · operated by REA Investments, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service7.3MW1 unit · solar
Rank in Minnesota#149of 767 · by capacity · #6,101 (tied) of 13,147 US

Location

Anoka County · MISO · MRO

Generating units

1 of 1 shown · 7.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit C1STF7.3SolarSolar Photovoltaic2021Operating

1 unit shown. Behind it, AEA holds the full engineering record: panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
REA Investments, LLC
Jointly held units
Novel Ventures Holding LLC 45% of 1 unit
Renewal Energy Alternatives, LLC 55% of 1 unit
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
64818

Common questions

How big is Connexus Solar Stanford 1STF?
7.3 MW across 1 generating unit in service.
Who owns and operates it?
Operated by REA Investments, LLC, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at Connexus Solar Stanford 1STF. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (7.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Minnesota energyAll facilities in the state→American Crystal Sugar - E Grand Forks7.5 MW operating capacity→ Lake Pulaski Solar7.5 MW operating capacity→ Melrose7.2 MW operating capacity→ Mountain Lake7.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming