Fuel spend$34.3M2023 · estimate
Capacity in service35.0MW3 units · gas
Net generation137GWh2023 · reported
CO₂ emitted224,200t2023 · reported to EPA · 1,446th highest of 6,030 in the US
Rank in Colorado#78 (tied)of 303 · by capacity · #3,899 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor45%2023
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Molson Coors USA LLC - Golden Brewery?
35.0 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
PSCO (Public Service Company of Colorado) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1980. The oldest operating unit is Unit GEN1 (1976); the newest is Unit GEN3 (1983).
When is it due to retire?
No retirement date has been filed for any operating unit at Molson Coors USA LLC - Golden Brewery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $34.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
224,200 t in 2023, reported to the EPA — the 1,446th highest of 6,030 US facilities that reported. Down from 573,381 t in 2011.