Fuel spend$11.2M2023 · estimate
Capacity in service31.3MW4 units · gas + biomass
Net generation75.8GWh2023 · reported
CO₂ emitted73,395t2023 · reported to EPA · 2,929th highest of 6,030 in the US
Rank in Wisconsin#71of 258 · by capacity · #3,983 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor28%2023
How big is Mmsd-Jones Island Wastewater Treatment Plant?
31.3 MW across 4 generating units in service — 22.1 MW of natural gas and 9.2 MW of biomass. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1990. The oldest operating unit is Unit GEN1 (1971); the newest are Unit SOL1, Unit SOL2 and Unit SOL3 (2013).
When is it due to retire?
No retirement date has been filed for any operating unit at Mmsd-Jones Island Wastewater Treatment Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas and landfill gas.
How much does it spend on fuel?
An estimated $11.2M in 2023 — natural gas $11.2M and oil & petroleum $3,544. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
73,395 t in 2023, reported to the EPA — the 2,929th highest of 6,030 US facilities that reported. Down from 89,774 t in 2011.