AMERICAN ENERGY ATLAS
Power·Wisconsin

Custer Energy Center

Manitowoc County, Wisconsin · MISO · operated by Manitowoc Public Utilities

2023 · headline year
Fuel spend$141,6292023 · estimate
Capacity in service24.5MW1 unit · gas
Net generation2.37GWh2023 · reported
Rank in Wisconsin#73of 258 · by capacity · #4,243 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Manitowoc County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 36,880 MMBtu · reported · $141,629 est.

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 24.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 124.5Natural GasNatural Gas Fired Combustion Turbine1999Operating

1 unit shown. Behind it, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Manitowoc Public Utilities
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
7795

Common questions

How big is Custer Energy Center?
24.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Manitowoc Public Utilities, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1999.
When is it due to retire?
No retirement date has been filed for any operating unit at Custer Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $141,629 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Wisconsin energyAll facilities in the state→Mmsd-Jones Island Wastewater Treatment Plant31.3 MW operating capacity→ Montfort Wind Energy Center30.0 MW operating capacity→ Ahlstrom Mosinee LLC23.4 MW operating capacity→ St Croix Falls23.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming