Fuel spend$1.98M2023 · estimate
Capacity in service106MW2 units · gas
Net generation23GWh2023 · reported
CO₂ emitted12,791t2023 · reported to EPA · 5,678th highest of 6,030 in the US
Rank in California#232of 1,713 · by capacity · #2,271 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor2%2023
How big is Miramar Energy Facility?
106 MW across 2 generating units in service.
Who owns and operates it?
Owned by
Sempra Energy Inc (100%) and operated by San Diego Gas & Electric Co, filed as investor-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating unit is Unit 1 (2005); the newest is Unit 2 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Miramar Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.98M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
12,791 t in 2023, reported to the EPA — the 5,678th highest of 6,030 US facilities that reported. Down from 74,900 t in 2011.