Wilmington, Los Angeles County, California · CAISO · operated by Harbor Cogeneration Co.
last reported to the EPA in 2016
2023 · headline year
Capacity in service107MW3 units · gas
Net generation25.6GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2016
Rank in California#230of 1,713 · by capacity · #2,260 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor3%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 318,898 MMBtu · reported
CO₂ emitted, t · 2011–16
Reported (through 2016)
Generating units
3 of 3 shown · 107 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
82.3
Natural Gas
Natural Gas Fired Combined Cycle
1988
Operating
Unit ST1
13.6
Natural Gas
Natural Gas Fired Combined Cycle
2001
Operating
Unit ST2
11.5
Natural Gas
Natural Gas Fired Combined Cycle
2001
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Harbor Cogeneration Co., filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating unit is Unit GEN1 (1988); the newest are Unit ST1 and Unit ST2 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Harbor Cogeneration Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?