Butler County, Ohio · PJM · operated by SunCoke Energy, Inc.
2023 · headline year
Capacity in service67.0MW1 unit · gas
Net generation333GWh2023 · reported
Rank in Ohio#58 (tied)of 189 · by capacity · #3,120 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor57%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
96% Refinery gas · 6.71 TBtu · reported4% Natural gas · 0.301 TBtu · reported
Refinery gas supplies 96% of the fuel energy it burned in 2023.
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
1 of 1 shown · 67.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit YNKE
67.0
Other gas
Other Gases
2011
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
Operated by SunCoke Energy, Inc., filed as commercial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2011.
When is it due to retire?
No retirement date has been filed for any operating unit at Middletown Coke Company, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?