AMERICAN ENERGY ATLAS
Industrial + power·Ohio

Haverhill Coke Company, LLC

Franklin Furnace, Scioto County, Ohio · PJM · operated by SunCoke Energy, Inc. · owned by Suncoke Energy Inc

2023 · headline year
Capacity in service67.0MW1 unit · gas
Net generation353GWh2023 · reported
CO₂ emitted921,343t2023 · reported to EPA · 633rd highest of 6,030 in the US
Rank in Ohio#58 (tied)of 189 · by capacity · #3,120 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor60%2023

Location

Scioto County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

95% Refinery gas · 7.53 TBtu · reported5% Natural gas · 0.398 TBtu · reported

Refinery gas supplies 95% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

0500,0001,000,0001,500,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 67.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SCKG167.0Other gasOther Gases2008Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 72 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Suncoke Energy Inc · 100%
Operating utility
SunCoke Energy, Inc.
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Metals
EPA facility ID
1002777
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
56848

Common questions

How big is Haverhill Coke Company, LLC?
67.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Suncoke Energy Inc (100%) and operated by SunCoke Energy, Inc., filed as commercial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2008.
When is it due to retire?
No retirement date has been filed for any operating unit at Haverhill Coke Company, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned refinery gas and natural gas.
How much CO₂ does it emit?
921,343 t in 2023, reported to the EPA — the 633rd highest of 6,030 US facilities that reported. Up from 810,574 t in 2011.

Related pages

Ohio energyAll facilities in the state→Orrville Municipal Power Plant72.0 MW operating capacity→ Greenup Hydro70.2 MW operating capacity→ Middletown Coke Company, LLC67.0 MW operating capacity→ Hog Creek Wind Project66.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming