Stevens County, Washington · AVA · operated by Hydro Technology Systems Inc
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit UN1 | 0.9 | Water | Conventional Hydroelectric | 1915 | Operating |
| Unit UN2 | 0.3 | Water | Conventional Hydroelectric | 1915 | Operating |
| Unit UNA | 0.2 | Water | Conventional Hydroelectric | 2006 | Operating |
| Unit UNB | 0.2 | Water | Conventional Hydroelectric | 2006 | Operating |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit UN2 | repowering | 2025-10 | 0.3 MW |
| Unit UN2 | uprate | 2025-10 | 0.1 MW |
| Unit UN1 | repowering | 2026-10 | 0.9 MW |
| Unit UN1 | uprate | 2026-10 | 0.1 MW |